UCO Geese

Physical Plant

Our Physical Plant provides a broad array of services. Please selected a tab on the left to find out more about these services, departments, work order system, documents, forms, and the building captain list.

Quick Links:

  • Snow Removal Map: click here
  • Key Request information: click here
  • Custodial Service Report: click here





Fall Break Projects 2014:



  • Administration   -   Replace sidewalk lights with 12' poles

  • Education          -   Paint select areas in the atrium 

  • Library              -   Install carpet in the Speech and Hearing Clinic conference room

  • Wantland Hall    -   Refinish gym floor

  • HES                  -   Stain children's playground fence

  • Liberal Arts       -   Replacing ceiling tile in the first floor hallways

  • Howell Hall 201  -   Repair lights

  • HPE                  -   Install ceiling fan 

  • Coyner Health    -   Paint hallways